The lab is taking new cases · 9am–5:30pm, Mon–Fri Urgent? Ring 0800 6890668
SDR Southampton Data Recovery 0800 6890668 Open a case

GU34 · Alton and Four Marks

Data recovery, Alton. GU34 drives, from Omega Park to Chawton.

Alton's built-up area held 17,874 people at the 2021 Census. The town is the end of the Alton line, with trains to London Waterloo and no direct service south — reaching Southampton means a change, usually at Woking, or the A31 west through Alresford and Winchester to the M3. Four industrial areas, Mill Lane, Newman Lane, Caker Stream and Omega Park, carry over a hundred businesses between them.

Tracked inbound post · return free No charge to diagnose on arrival Quotes fixed in writing

Speak to an engineer about it
0800 6890668

The complaintWhy it happens hereFirst step
A college e-portfolio drive that stopped mountingHSDC teaches on an Alton campus of its ownImaged first, then read from the copy
An assistive-technology laptop from a specialist schoolTreloar's supports around 170 learners aged four to twenty-fiveGive us the term date; it sets priority
A heritage railway's photograph and ticketing archiveThe Watercress Line runs from Alton to New AlresfordSwitch off before the second
An Omega Park server that will not mountOver a hundred businesses work from four industrial areasEvery disk travels, marked by bay
A visitor-attraction PC holding collection imagesJane Austen's House stands just outside town at ChawtonStop using it; post the drive
Posting it: send it to our secure intake lab by tracked, fully insured post — return postage is on us — with the shipping form packed alongside. The complete packing routine sits on the posting details.

An Alton job, in order.

Records that have to lastTreloar School and Treloar College at Holybourne work with around 170 children and young people aged four to twenty-five, and the teams around them include assistive technologists. Settings and learner records of that kind are not recreated from memory.
A line that ends hereThe Watercress Line, registered charity 284406, runs between Alton and New Alresford and joins the national network at Alton station. Its digitised archive and its ticketing sit on ordinary disks, the same as everyone's.
One BAE site, and a town around itBAE Systems lists Alton among its South East sites. Controlled engineering stays where it belongs. What reaches this bench is home machines, small-office servers and personal externals.
Paperwork the finance office acceptsA quote set down in writing and left there, a VAT invoice for the ledger, and a checked file listing handed over before you pay.

Alton, four short answers.

Is there an Alton office?

No, and the reason is simple. A single well-found bench is worth more than a row of counters, and a drive that has to come apart is opened under clean air there rather than in a back room. Hand yours to a post office in GU34 and the free diagnosis starts the morning it lands.

There is no direct train south. Does that matter here?

Not to a parcel. Alton is the end of its own line, and going to Southampton by rail means a change, usually at Woking; by road it is the A31 through Alresford and Winchester onto the M3. A padded box needs neither route.

Can a RAID set be read without its controller?

Yes. Arrays are rebuilt here from images of the member disks, so no matching hardware has to be found. Send every disk, the ones the box flagged as failed included, and leave the rebuild option untouched.

Is it worth ringing before we post anything?

Ring, and spend two minutes describing the fault and what depends on it. That conversation settles which disks come out, how they are marked and how the parcel is made up, before anything is unplugged.

One parcel out of Alton, and the bench starts.

Switch it off, describe what went wrong, and take a free diagnosis before you commit to anything.

0800 6890668